Kwik-Fli, Slow Build: 11-12 June 2011

Kwik-Fli, Slow Build Blog Series header graphic. With a close-up of the model's engine at center, the graphic is done in orange and blue.

11-12 June 2011. I had two days strangely and “unfortunately” available: I was busy with errands and handymen in the morning, and in the afternoon the weather was horrible, with lightning, and thunderstorms, so both days I couldn’t go and fly!

Graphic showing a map of part of Virigina, the date of June 12, 2011 and a stormy cloud.

I was able to work on the wing, thou! Now it is “almost” finished: I still have to add the center sheeting, the cap-strips and the Ailerons hardware, but nevertheless the hard part is finished! I think the first thing to do is the find a suitable Aileron servo (with mount?) and move from there; then the linkage coupling, and from there to the bell crank, to be installed when the linkage is ready. When this is finished, it will be the right time for the center sheeting and the cap strips!

Next post: June 22, 2019

See all the Kwik-Fli, Slow Build posts!

—————————————————————————
For more information on the National Model Aviation Museum, including our location, hours and admission fees visit: www.modelaircraft.org/museum